March 4th 2020, Scaffolding Erected
Scaffolding Erected to Enable First Floor Level Brickwork On site at Meadowhead Drive, there
End of February 2020, Outer Brickwork Ground Level
Brickwork carrying on despite the rain and hail! We managed to capture a few
January 16th 2020, Concrete Blockwork
The Brickwork Team are working hard to progress... It might be cold outside, but
December 2019, Brickworks started
Brickworks started in November 2019 It was a fairly dry December this year, allowing for
November 2019, Drainage soil pipes going in
Drainage soil pipes going in. Carl Holden Homes has now installed soil drainage pipes using
October 2019, Cement being poured into the raft foundation
Late October, cement being poured into the raft foundation. Progress has been made at the